Plan your transport

Separate transport preparation from subsequent commissioning. The person responsible for the equipment determines whether specialist checks are required before or after the journey. Package count, external dimensions and confirmed handling instructions are particularly relevant to planning. State whether stands, measuring heads and cables share the same case. This allows the complete shipment contents to be discussed before collection, rather than discovered when loading begins.

What matters

  • Match the equipment reference with the recipient
  • Include measuring heads and stands in the inventory
  • Provide packed dimensions rather than instrument dimensions